Sunday, June 22, 2025

Dothan Day 2

 I completed staining the shower today as well as other tasks - clean chicken coup, laid some natural path material for consideration and developed preliminary design for pond fountain placement and its solar panels.

The completed stained shower front entrance.

The completed stained shower back and side.

The staining in process.
I installed a Shower Shelf.

I will create a path from the Pond House's front and back doors to the shower. Below are the sample materials we are considering - bricks, grass clippings, pine needles.

Here is the chicken coup to be cleaned
Before cleaning......
After cleaning with new bedding made from leaves, pine needles and grass clippings....
The compost pile before.
After...
Happy chickens in their run with the coup in the back left.
One of the hens that has been brooding in the coup the past few days, laid an egg. When she exited, all of the hens celebrated.

The egg is in the 4th bin!

Pond Fountain needs better placement. We are considering options.

I took a very HOT sun stroll around the property this afternoon. I found the trail around the pond that needs some work.





No comments:

Post a Comment

Dothan Alabama

I returned to Dothan AL for another 2 weeks of HelpX.net .  Monarch Butterfly caught by Banana Spider Young Mimosa Tree. I will transplant t...